612 - Thorton Water Project | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Johnstown, CO | City of Thorton | Rock | 485' x 68" Ø | |
SUMMARY: Bradshaw Construction installed two 68" OD rib-and-board tunnels as part of the Thornton Water Project. The two tunnels (250' and 235') were installed underneath rivers, the Cache La Poudre River in Windsor, CO, and the Little Thompson River in Johnstown, CO. The tunnels were installed behind an Akkerman 540 TBM out of secant pile shafts. Ground conditions consisted of claystone and sandstone. Complete Project Profile |
572 - Sanitary Sewer Improvements; Goff Brook Overflow Closure | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Wethersfield, CT | MDC | Rock | 650' x 60" Ø | |
![]() |
SUMMARY: Bradshaw completed a 60” microtunneling/conventional TBM project in Wethersfield, Connecticut for 30” and 48” CCFRPM sanitary sewer installations. The first tunnel (650’) was installed by an Akkerman WM480 tunnel boring machine in stiff, wet clay. The 2nd (420’), 3rd (855’), 4th (152’), and 5th (450’) tunnels were completed behind a Herrenknecht AVN 1200 microtunnel boring... Complete Project Profile |
540 - Improvements to Lower Gwynns Runs Interceptor, Phase II | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Baltimore, MD | City of Baltimore | Rock | 2543' x 72" Ø | |
![]() |
SUMMARY: Bradshaw completed 2,500' of tunnel from Franklin Street to Baltimore Street for a 36" gravity sanitary sewer. The 72" tunnel consisted of four segments, the longest of which was 1,200' beneath Amtrak and Norfolk Southern Railroads. Local geology consisted of very hard rock, with UCS tests of up to 37,000 psi, and was further complicated by the presence of periodic veins of highly decomposed... Complete Project Profile |
519 - DCW M Street Diversion Sewers | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Washington D.C., | DCW | Soft Ground | 2,327' x 72"-144"Ø | |
![]() |
SUMMARY: Bradshaw completed installation of 1,313 linear feet of 144 inch, and 1,014 liner feet of 72 inch rib and board tunnel for 110 inch and 48 inch fiberglass reinforced sewer. An Akkerman BS-120 digger shield and an Akkerman WM-60 TBM were used to excavate the tunnels. The work was in a busy urban area adjacent to the Anacostia River and a CSX Railroad. The tunnel was excavated through clay and... Complete Project Profile |
497 - International Paper Company Effluent Pipeline | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Cantonment, FL | International Paper | Soft Ground | 1150' x 75" Ø | |
SUMMARY: Bradshaw Construction installed 1,150' of 75' O.D. Rib and Board Tunnel, as well as 48" DIP Carrier pipe to be utilized as an effluent pipeline. Bradshaw Construction worked through severe weather conditions which caused shaft movement and water intrusion. In addition, the work was completed within a residential zone. Bradshaw worked closely with the General Contractor and local residents... Complete Project Profile |
478 - National Center Sanitary Sewer Project | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Crystal City, VA | Arlington County | Mixed Face | 1,890' x 68" Ø | |
![]() |
SUMMARY: The NCSS project highlights Bradshaw Construction's ability to redesign projects to increase efficiency, decrease costs, and streamline logistics. The NCSS project was initially designed as a pilot tube MTBM job. However, this would have involved the installation of 8 shafts in the middle of Jefferson Davis Highway - a major artery into and out of DC. We redesigned the project as a rib-and-board... Complete Project Profile |
477 - Abingdon WTP Expansion | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Abingdon, MD | Harford County Public Works | Soft Ground | 372' x 114" Ø | |
SUMMARY: Bradshaw Construction successfully completed a TBM Tunnel using an Akkerman Digger Shield and 114"Ø Rib & Board Supports under Interstate 95 for the Abingdon Waste Water Treatment Plant. With the key goal of minimizing potential settlement of I-95, the tunnel size was reduced from a plan diameter of 144" to 114". However, the size reduction increased the challenge of installing the Ductile Iron... Complete Project Profile |
468 - Flint River Transmission Main - Phase 2 | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Atlanta, GA | City of Atlanta | Mixed Face | 1,040' x 72" Ø | |
![]() |
SUMMARY: The Flint River Transmission Main project was constructed using conventional TBM tunneling in the Hapeville neighborhood of south Atlanta, GA beneath Old Dixie Highway and an active Norfolk Southern railroad. The single 1,040' tunnel consisted of three separate curves. The first two were per plan, while the third was a 650' radius curve added during the tunnel excavation process to avoid a... Complete Project Profile |
467 - Briar Creek Sewer Phase 1B Eastover Apartments Tunnel | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Charlotte, NC | Charlotte-Mecklenburg Utility Dept. | Mixed Face | 692' x 101.5"Ø | |
![]() |
SUMMARY: Bradshaw Construction Corp. has completed a 700 foot long by 101” diameter rib-and-board tunnel that was originally designed as a 25 to 40 deep cut-and-cover trench. The tunnel was advanced with a 101” diameter digger shield. 60” diameter Fiber Reinforced carrier pipe was installed, blocked and grouted in the tunnel. Complete Project Profile |
457 - Battery Park Trunk Sewer Tunnel | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Richmond, VA | City of Richmond | Soft Ground | 3,400' x 144" Ø | |
![]() |
SUMMARY: Bradshaw responded to the City of Richmond, Virginia's emergency flooding caused by Tropical Storm Ernesto by installing 3,400’ of 110” fiberglass pipe in tunnel to permanently by-pass a collapsed combined sewer. Bradshaw used an Akkerman BS-120 digger shield and ribs and boards to construct the tunnel. Bradshaw pipe jacked 1,000’ of 48” RCP in one run and 260’ of 60” RCP in another... Complete Project Profile |
441 - Sumter Avenue Storm Drain | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Rock Hill, SC | City of Rock Hill | Soft Ground | 191 x 84" Ø | |
![]() |
SUMMARY: Bradshaw installed a replacement storm drain under the Norfolk Southern Railroad. The tunnel traversed two mainline and one siding sets of tracks in Rock Hill, SC. The existing CMP storm drain was collapsing. The tunnel was accomplished by installing 84" diameter x 24" wide smooth back 4-flange liner plates behind a shielded Akkerman tunnel machine. The machine was launched into the base of an... Complete Project Profile |
432 - Irwin Creek Relief Sewers Phase 2 | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Charlotte, NC | Charlotte-Mecklenburg | Mixed Face | 4,700' x 60"-102" Ø | |
![]() |
SUMMARY: Bradshaw constructed 24 shafts that were 20 to 50 feet in depth of soldier pile and wood lagging. Rib and board was used above the water table and liner plate for below. 4700 linear feet of 60-102 inch tunnels for 36 inch and 54 inch ductile iron pipe. 900-1300 linear feet included curves by tunnel boring machine with liner plate under NSR Railroad. Drill & Blast. Complete Project Profile |
430 - Deep River Outfall Sewer | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | High Point, NC | City of High Point | Rock | 1,400' x 82"- 96" Ø | |
SUMMARY: This project involved the utilization of two tunneling methods: hand mine drill & blast, and a TBM capable of mining through hard rock conditions. For the most part the 1,000' TBM run was self-supporting, but some of the weaker zones required rock bolts, roof channels, and even liner-plates for a short reach. Two drill and blast road crossings totaling 400' were completed on this job. Both drill... Complete Project Profile |
418 - Elizabethtown Transmission Reinforcements - Phase II | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | South Bound Brook, NJ | Elizabethtown Water Co. | Rock | 1,245' x 101" Ø | |
![]() |
SUMMARY: The Elizabethtown project highlights Bradshaw's ability to quickly adapt to major problems in an efficient, expedient manner. A special head was fabricated specifically for this project, based upon the unique conditions indicated by the boring logs. However, the head proved ineffective. Our fabrication department modified the head, and anticipated production rates returned to the expected amount... Complete Project Profile |
377 - North Central Hillsborough Inter-tie - Phase 2 | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Tampa, FL | Tampa Bay Water Authority | Rock | 300' x 99" Ø | |
SUMMARY: Bradshaw Construction Corp. was subcontracted to Rockdale Pipeline Inc. (RPI) to tunnel under the Hillsborough river and install an 84-inch diameter water main in the tunnel. Two shafts were constructed on either side of the river by RPI using driven steel sheets. BCC mined the tunnel by jacking a 98-inch diameter steel casing behind a 101-inch diameter earth pressure balance (EPB) tunnel boring... Complete Project Profile |
370 - South Central Hillborough Intertie Phase 1 | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Tampa, FL | Tampa Bay Water Authority | Soft Ground | 1,888' x 99' - 101.5" Ø | |
![]() |
SUMMARY: Bradshaw was subcontracted by Westra Construction to mine a total of (8) tunnels under state roads and open cut (2) drives for the Tampa Bay Water Authority. 101.5 inch and 99 inch rib and board supports were installed to accommodate and install a 72 inch steel water main. The ground conditions consisted of soft ground and was below the water table. Complete Project Profile |
308 - Fullerton Water Transmission Main Section I | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Fullerton, MD | Baltimore County DPW | Soft Ground | 1,707' x 112" Ø | |
![]() |
SUMMARY: Bradshaw used a Lovat tunnel boring machine (TBM) to construct 1,707 feet of 112 inch OD rib and board tunnel for an 84 inch welded steel watermain. Bradshaw also installed a 42' x 72' x 35' deep elliptical NATM mining shaft. The tunnel ground conditions were alluvial deposits of silt, sand and gravel. The challenges of the project were: 1) the limited stand up time of the alluvial soils in... Complete Project Profile |
273 - Ruby Avenue Storm Sewer Extension | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Kansas City, KS | City of Kansas City | Soft Ground | 1,665' x 143"Ø | |
![]() |
SUMMARY: Bradshaw Construction installed 1,665' of 143” O.D. steel rib and board tunnel for a 96” RCP storm sewer using a modified Lovat TBM. The tunnel was part of a 6,630’ storm sewer project to alleviate flooding in the Argentine area of Kansas City, Kansas. Bradshaw also installed a solder pile and wood lagging mining shaft that attached to an existing box culvert storm drain. The primary... Complete Project Profile |
255 - 96-Inch and 84-Inch Diameter Steel Water Main | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Lanham, Maryland | WSSC | Soft Ground | 900' x 132"Ø | |
![]() |
SUMMARY: Bradshaw installed 900’ of 132” OD rib and board tunnel in two drives with mining and receiving shafts for each. The tunnels were excavated through silts and sands using a TBM digger shield. The first tunnel was under Route 50 and the second was under Amtrak Railroad’s high speed rails between DC and Baltimore. 84” and 96” OD steel water main was installed in the tunnels... Complete Project Profile |
1JV2 - Bushy Park Water Tunnel | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Bushy Park, SC | Charleston CPW | Soft Ground | 14,847 x 99"Ø | |
![]() |
SUMMARY: BTM Joint Venture, led by Bradshaw Construction, constructed 14,847’ of 99” raw water intake tunnel for the Commissioners of Public Works (CPW) of Charleston, SC. This tunnel extended CPW’s water source further up the Cooper River improving the quality and increasing the quantity of water. The entire tunnel was mined with a Lovat tunnel boring machine (TBM) through Cooper Marl... Complete Project Profile |
1JV1 - East Bay/Calhoun Drainage Facilities Division I - Collection Tunnel System | ||||||
PROJECT TYPE |
SUB TYPE |
LOCATION |
OWNER |
GEOLOGY |
DIMENSIONS |
|
TBM Tunneling | Conventional | Charleston, SC | City of Charleston | Soft Ground | 2,880' x 120"Ø | |
![]() |
SUMMARY: BTM Joint Venture, led by Bradshaw Construction, constructed the first deep storm sewer tunnel for the City of Charleston to control flooding along Calhoun Street to Marion Square Park. The work consisted of 2,880’ of 120” rib & board TBM tunnel for a 96” ID cast in place storm sewer, two (2) caisson shafts, and two (2) drop stack intakes. The principal challenge on the project was first... Complete Project Profile |